Gare de Lausanne
Project Manager / Senior Tunnel Engineer
Geotechnical inspection, structural analysis and risk management for the operational station transformation within the Leman 2030 programme.
Onur Koç / Senior Tunnel Engineer & Project Manager
Onur Koc leads the design of complex underground structures across rail, road, energy and utility infrastructure - from early studies to construction delivery.

Zurich, Switzerland
Available for complex underground challenges
Core expertise
Selected work
Rail, logistics and energy infrastructure delivered across demanding operational, geological and programme conditions.
Project Manager / Senior Tunnel Engineer
Geotechnical inspection, structural analysis and risk management for the operational station transformation within the Leman 2030 programme.
Project Manager / Senior Tunnel Engineer
Design services for a 75 km autonomous cargo network, including a single-tube TBM and SCL tunnel, shafts and portals.
Senior Tunnel Engineer
Design of access tunnels, powerhouse cavern and low- and high-pressure waterways for a complex underground energy facility.
Project archive
Open any project for a concise view of Onur's role and engineering scope.
Project Manager / Senior Tunnel Engineer
Geotechnical inspection, structural analysis and risk management for a major operational station transformation.
Project Manager / Senior Tunnel Engineer
Design services for a 75 km TBM and SCL cargo tunnel network, including shafts and portals.
Senior Tunnel Engineer
Design of access tunnels, powerhouse cavern, waterways and pressure tunnel linings.
Senior Tunnel Engineer
Starter and tail tunnel design, plus squeezing-ground risk assessment and mitigation for the TBM drive.
Senior Tunnel Engineer
Detailed geotechnical and structural design for excavation and support under low cover and complex urban interfaces.
Senior Tunnel Engineer
False-ceiling connection design and reinforced-concrete engineering for a major transit programme.
Senior Tunnel Engineer
Analysis and design of cross passages, including dewatering and ground-improvement requirements.
Structural & Geotechnical Engineer
Design of two city-centre stations and settlement analysis for overlying buildings.
Structural & Geotechnical Engineer
Structural analysis and design of a 600 m cut-and-cover section linking two mined tunnels.
Structural Engineer
Tunnel refurbishment and pavement design for swelling-ground conditions.
Structural Engineer
Structural analysis of multiple tunnel components for the refurbishment of Austria's longest road tunnel.
Structural Engineer
Final-lining analysis for the new tube and structural design for refurbishment of the existing tube.
Tunnel Engineer
Three-dimensional analysis of TBM advance through a fault zone.
Structural & Tunnel Engineer
Primary and final lining design at intersections, plus cut-and-cover section design.
Structural Engineer
Reinforced-concrete section design and analysis of false-ceiling formwork stripping.
Tunnel Engineer
Analysis of typical cross-sections in heavily karstified limestone and block-breccia conditions.
Structural & Geotechnical Engineer
Final lining, false ceiling, ventilation cavern and retention-dam analysis and design.
Career
More than 17 years spanning structural calculations, geotechnical design, multidisciplinary coordination, technical oversight and project leadership.
2023 - Present
Zurich, Switzerland
Senior Tunnel Engineer / Project Manager
2018 - 2023
Salzburg, Austria
Senior Tunnel Engineer
2008 - 2018
Salzburg, Austria
Structural Engineer / Tunnel Engineer
Education & qualification
Geotechnics and Engineering Management
TU Vienna
TU Istanbul
Languages
Publications
Proceedings of WTC 2023, Athens
Geomechanics and Tunnelling, vol. 9, no. 4, pp. 338-344
Third International Symposium on Underground Excavations for Transportation, Istanbul