Onur Koç / Senior Tunnel Engineer & Project Manager

Engineering clarity
below the surface.

Onur Koc leads the design of complex underground structures across rail, road, energy and utility infrastructure - from early studies to construction delivery.

17+
Years in underground design
4
Continents of project delivery
C2
German and English
Onur Koc

Zurich, Switzerland
Available for complex underground challenges

Core expertise

Design leadership for the places the world cannot see.

Project managementGeotechnical designStructural analysisTBM & SCL tunnelsRisk managementConstruction support

Selected work

Projects shaped by rigorous thinking.

Rail, logistics and energy infrastructure delivered across demanding operational, geological and programme conditions.

01
2025 - PresentLausanne, Switzerland

Gare de Lausanne

Project Manager / Senior Tunnel Engineer

Geotechnical inspection, structural analysis and risk management for the operational station transformation within the Leman 2030 programme.

Live rail operations
02
2023 - 2025Switzerland

Cargo Sous Terrain

Project Manager / Senior Tunnel Engineer

Design services for a 75 km autonomous cargo network, including a single-tube TBM and SCL tunnel, shafts and portals.

75 km network
03
2021 - 2023Israel

Manara Pumped Storage

Senior Tunnel Engineer

Design of access tunnels, powerhouse cavern and low- and high-pressure waterways for a complex underground energy facility.

156 MW capacity

Project archive

Seventeen reference projects.
One continuous discipline.

Open any project for a concise view of Onur's role and engineering scope.

01Gare de LausanneSwitzerland2025 - Present

Project Manager / Senior Tunnel Engineer

Geotechnical inspection, structural analysis and risk management for a major operational station transformation.

02Cargo Sous TerrainSwitzerland2023 - 2025

Project Manager / Senior Tunnel Engineer

Design services for a 75 km TBM and SCL cargo tunnel network, including shafts and portals.

03Manara Pumped Storage Power PlantIsrael2021 - 2023

Senior Tunnel Engineer

Design of access tunnels, powerhouse cavern, waterways and pressure tunnel linings.

04Effluent Outfall TunnelUSA2021 - 2022

Senior Tunnel Engineer

Starter and tail tunnel design, plus squeezing-ground risk assessment and mitigation for the TBM drive.

05French Hill TunnelsIsrael2019 - 2022

Senior Tunnel Engineer

Detailed geotechnical and structural design for excavation and support under low cover and complex urban interfaces.

06Eglinton Crosstown LRTCanada2020 - 2021

Senior Tunnel Engineer

False-ceiling connection design and reinforced-concrete engineering for a major transit programme.

07Purple (D) Line, Section IIIUSA2018 - 2021

Senior Tunnel Engineer

Analysis and design of cross passages, including dewatering and ground-improvement requirements.

08Vienna U5-U2 StationsAustria2017 - 2018

Structural & Geotechnical Engineer

Design of two city-centre stations and settlement analysis for overlying buildings.

09Granitztal Tunnel ChainAustria2015 - 2017

Structural & Geotechnical Engineer

Structural analysis and design of a 600 m cut-and-cover section linking two mined tunnels.

10Geisswand Road TunnelAustria2015 - 2017

Structural Engineer

Tunnel refurbishment and pavement design for swelling-ground conditions.

11Arlberg Road TunnelAustria2015 - 2016

Structural Engineer

Structural analysis of multiple tunnel components for the refurbishment of Austria's longest road tunnel.

12Gleinalm Road TunnelAustria2014 - 2015

Structural Engineer

Final-lining analysis for the new tube and structural design for refurbishment of the existing tube.

13Semmering Base TunnelAustria2012 - 2016

Tunnel Engineer

Three-dimensional analysis of TBM advance through a fault zone.

14Eurasia Tunnel, NATM SectionTurkey2011 - 2013

Structural & Tunnel Engineer

Primary and final lining design at intersections, plus cut-and-cover section design.

15Himmelreich TunnelAustria2011

Structural Engineer

Reinforced-concrete section design and analysis of false-ceiling formwork stripping.

16RN43 Road Tunnels T2 & T3Algeria2008 - 2011

Tunnel Engineer

Analysis of typical cross-sections in heavily karstified limestone and block-breccia conditions.

17Tauern Road TunnelAustria2008 - 2011

Structural & Geotechnical Engineer

Final lining, false ceiling, ventilation cavern and retention-dam analysis and design.

Career

Built on both analysis and accountability.

More than 17 years spanning structural calculations, geotechnical design, multidisciplinary coordination, technical oversight and project leadership.

2023 - Present

Pini Group SA

Zurich, Switzerland

Senior Tunnel Engineer / Project Manager

2018 - 2023

Dr. Sauer & Partners GmbH

Salzburg, Austria

Senior Tunnel Engineer

2008 - 2018

IGT GmbH

Salzburg, Austria

Structural Engineer / Tunnel Engineer

Education & qualification

2008
MSc, Civil Engineering

Geotechnics and Engineering Management
TU Vienna

2001
BSc, Civil Engineering

TU Istanbul

MembershipOeGG - Austrian Society for Geomechanics

Languages

TurkishNative
GermanFluent - C2
EnglishFluent - C2
FrenchIntermediate - B1

Publications

Contributing to the discipline.

2023

P. Salak, O. Nathan, O. Koc, A. Pamsl

French Hill road tunnels: A pragmatic rock support approach

Proceedings of WTC 2023, Athens

2016

B. Kohlbock, O. Koc, T. Ayten

Istanbul Strait Road Tube Crossing: Design of NATM Tunnels and Asian Transit Box Excavation

Geomechanics and Tunnelling, vol. 9, no. 4, pp. 338-344

2013

O. Koc

Strategies for Design of the Support Measures in Tunneling on Basis of Eurocode

Third International Symposium on Underground Excavations for Transportation, Istanbul